Energy Audit

Energy Audit

We conduct Detailed energy audits primarily for Steam & condensate, compressed Air & Thermic fluid systems
• Identifying energy saving opportunities
• Recommending energy cost reduction measures
• Implementation of all the saving measures.
Areas we explore for savings……
• Steam Generation
• Steam Distribution
• Steam Utilization
• Condensate Management
• Turnkey Piping Projects
• Field Instrumentation & Automation.
• Hands on exp. of commissioning & trouble shooting of all steam accessories
• Energy Audit:

Energy audit

Energy Audit Scope

Xwin

Steam Generation

  • • Efficiency trial for working Boiler/Performance Evaluation Test as per BS 845
  • • Detailed Study of fuel consumption
  • • Boiler water study (Feed water, Raw water and Blowdown water)
  • • Evaluation of possible heat recovery.

Steam Distribution

  • • Steam pipe line sizing and pressure drop calculation
  • • Steam pipe line insulation survey and estimation of condensate load
  • • Study of steam line accessories such as PRS, Drain Traps, air vents, moisture separators etc.
  • • Identification and quantification of steam leakages
Xwin
Xwin

Trap Study

  • • Performance evaluation of existing trapping system
  • • Identification and tagging of each trap
  • • Evaluation for correctness for type, size, application and operation
  • • Quantification of steam loss
  • • Preparing Electronic Database

Steam Utilization

  • • Detail process study with respect to steam consumption
  • • Steam load estimation and Energy balance across all major unit operations.
Xwin
Xwin

Condensate and Flash Steam Recovery

  • • Study of present Condensate Recovery system
  • • Quantification of maximum possible recovery of condensate and flash steam
  • • Identification for the potential for the flash steam generation and Utilization

Other Areas

  • • Examination of present metering and controls for energy use and suggest better methods for energy accounting
  • • Exploring the possibility of recovering the waste heat from the process
Xwin

Preparation/Optimizations of Bill Of Material along with Payback Period